Most of them start as a square of mud

New build with nothing in it, or an old garden that’s given up. Either way the work is the same and it’s nearly all under the surface. Get that wrong and it sinks, puddles and moves — whatever you put on top of it.

A back garden stripped to bare earth with a wheelbarrow ready to start

Built up in layers, bottom first

A cut through a finished garden. We work up from the bottom of it — read this one from the ground.

Dig out

Old turf, old slabs, roots, rubble. Barrowed out and skipped. We take it down until we’re on something that isn’t going to move.

Sub base

Fresh sub base in and compacted. On one job — back patio, side path and a twelve-metre driveway — we put near twenty tonne of material in.

Sand, membrane, levels

Levels set so water runs away from your house, not towards it. Weed fabric where it’s needed, so it stays clean in two years’ time.

Then the bit you actually see

Turf, artificial grass, slabs, monobloc, decking, fence. All of it only as good as the three layers under it.

What goes on top

A new-build back garden with fresh green turf and a light slabbed path along the fence

Real turf

Laid on prepared ground, with the watering instructions that actually matter. Three weeks later it’s thick enough for its first cut — we’ve the photos to prove it.

A small back garden finished in bright artificial grass with a brick border

Artificial grass

30mm, properly edged and pinned. No matter how small or large the garden, we can artificial grass it — and then you never cut it again.

A large slabbed patio freshly laid across the back of a new-build house

Slabs, patios and paths

Patios, side paths, driveways up to twelve metres. We did one house from back patio to front driveway in three days, start to finish.

A new six foot double-boarded timber fence running along a boundary beside a house

Fencing and gates

Treated timber as standard, 4x4 posts concreted in. Six foot, double boarded, vertically slatted — whatever gives you the privacy you’re after, built to survive the next storm rather than the last one.

A patio that puddled

Sunken and holding water every time it rained. We lifted the lot, scraped out what was under it, put fresh sub base and sand in and relaid every slab — the proper way it should have been done the first time.

A patio lifted, slabs stacked and the muddy ground underneath exposed Mid-job
The finished patio relaid flat and level against the lawn After

Hedge out, fence in

Same customer, one boundary, start to finish. The conifer hedge came out, the stumps were ground, and a double side-boarded six foot fence went in where it had been — the privacy without the forever growing.

A tall conifer hedge running along the pavement outside a house, overhanging the footpath Before
The same pavement with the hedge removed and the stumps ground out, the house now fully visible Hedge and stumps out
A new six foot double-boarded timber fence standing along the same boundary After

“The job was done in 1 day with a team of about 6 folk, job done to a great standard and I could not be happier! Getting the garden done was one of the more stressful projects of a new build and with John and his team it was stress free and with complete ease.”

Sarah, Glasgow — June 2022, new build turf and slabbing

One of 88 reviews on MyBuilder.